Project Description

Located in Denver, the Park Central Plaza job had 3 phases: Tower 1 Joint Leak, Tower 2 Joint Leak and Plaza Deck sealant repairs. We had to remove pavers, grout beds and old sealant from both Towers. We then installed a new waterproof membrane, drain mat and grout bed. The plaza coating required removing 1,800 linear feet of sealant and then resealing the entire area. The work was completed for JLL. Repair cost: $48,500

Location

Denver, CO

Engineer

Jones Lang LaSalle

Services

expansion joint repair